Monday, December 28, 2009

An Update

Hello!

Hate to say it, but this was somewhat of a languid semester, and the Honduran government and Roberto Micheletti are mostly to blame. Since the coup that occured there on June 28, 2009, the country hasn't exactly been a war zone but there was enough uncertainty that we couldn't travel down there at least until the elections (November 29) were complete, and probably until after the new President starts his new term (January 27, 2010). Since we didn't really have approval for a project we didn't start heavy fundraising until recently.

You may be asking, approval for what? Well, I should probably start by saying that we did finish our first project in Los Sanchez, Honduras in May of 2009. The people in this small village now have clean drinking water from a spring being delivered to them through a gravity-fed pipeline. So now we are looking to continue with more projects in the same area of Honduras.

We are currently working on two. First, we are returning to Los Sanchez to complete some smaller projects utilizing the water that they now have. Some options on the table are a tilapia farm (a source of food and income), an irrigation system (for farming), latrines and chimneys (currently cooking is done inside their huts, leaving soot on the walls and making the air hazardous to breathe). Second, we are going to another village, La Barranca, to complete a water distribution project that is somewhat similar to that which we completed in Los Sanchez. La Barranca had a water source until it was destroyed by Hurricane Mitch in 1998; since then they have been obtaining polluted water from a local farmer's cattle runoff. The big difference is that the source is not a freshwater spring but Rio Choluteca, a river with a reputation for its pollution. So this time around we must concern ourselves with the quality of the water which can be quite expensive. Since La Barranca (pop. 370) is only about two miles away from Orocuina Centro (pop. 4,500), the main city of the Orocuina region (pop. 20,000), we may be able to include Orocuina Centro in the distribution line. Due to problems with wells, Orocuina Centro currently has water only four hours a day, so this project would give them access to water 24/7!

In December we received approval from EWB-USA to continue our work in the program with these projects, and we have set a tentative goal to travel over our Spring Break (March 8-12) to assess the feasibility and details of both projects. So now, its paperwork and fundraising for the next two and a half months. We have a batch of new officers and members, and we're very excited to begin work on this project. We'll keep you posted on how everything's going!

Adam Dellinger
VP Membership

Thursday, February 5, 2009

EWB in the news!

The University of Toledo chapter of Engineers Without Borders has been awarded a $10,000 grant from the Toledo Rotary Foundation for support of a water supply project in Los Sanchez, Honduras.

WTOL-11 reports on the story

http://www.youtube.com/watch?v=SgzDNfY042Q

Water Project in Los Sanchez, Honduras

Hello EWB-UT Community!

Here is a quick update on the progress of our water-distribution system in Los Sanchez, Honduras.

EWB-UT has just completed the first trip of the implementation phase in January 2009 and is currently raising funds for the completion of the project.

CURRENT STUDENTS:

We need your help!  All majors are needed to fundraise and actively participate in the logistics and design in order to complete the water project.

Weekly meetings are held in the lobby of Nitschke Hall on Tuesday at 6 PM.  Just show up or email ewb.utoledo@gmail for information on how you can help.

ALUMNI AND FRIENDS:

As alumni you probably have received numerous phone calls asking for contributions to the university.  Donate to EWB and you will know exactly where your money is going!

DONATE TODAY!!
http://www.facebook.com/l.php?u=http://utssl.utoledo.edu%2Futfoundation%2Fgift_engewb.asp

Thank you all for your continued support of EWB-UT and our shared mission of alleviating poverty worldwide through sustainable engineering projects!

Tuesday, November 4, 2008

Max and Erma's Fundraiser

Please come help support The University of Toledo Engineers Without Borders
project in Honduras. Max and Erma's will donate 20% of all their sales to our
group. You just need to show up hungry and with our flyer (attached below)!

Sunday, October 26, 2008

Honduras Project

We are currently raising funds for our chapter to do a water project in Honduras. The project will cost roughly $25,000 and we are in the midst of much fundraising. Here is some info about the project:

LOS SANCHEZ, HONDURAS WATER SUPPLY & SANITATION PROJECT INTRODUCTION

Engineers Without Borders (EWB), through The University of Toledo chapter (EWB-UT) has undertaken the responsibility to develop a Water Supply Project for the Village of Los Sanchez, Honduras. To this regard, a few members of the chapter conducted an assessment trip to the Village during the week of May 4, 2008. The objective was to compile basic information needed for designing the system and to assess the overall sanitation needs of the community.

The Village of Los Sanchez is located within the Municipality of Orocuina, in the Department of Choluteca, Honduras and approximately 15 miles north of the City of Choluteca (Figure 1). The Village is very organized with a strong sense of unity, and there is indication that the community has been exposed to (and adopted) basic health/sanitation practices.

The high level of organization within the community was one of the reasons why Los Sanchez was selected for this project. For over 7 years, the community has been conducting efforts to obtain clean water supply. They have created a Water Board that has negotiated the rights to obtain water from a nearby spring and for right-of-way for the conduction line.

Information provided by the Health Department of Orocuina indicates that as of 2006 there were 29 residences occupied by 156 inhabitants (83 female, 73 male), for an average of 5.3 inhabitants per residence. Approximately 58% of the population (90 youths) are less than 19 years or younger, with children under 12 years old being the highest demographic.

Relations between EWB-UT and the Village of Los Sanchez were originally established via a personal contact working in the Peace Corps in Orocuina. This contact also established relations between EWB-UT and the mayor’s office of Orocuina, which helped provide transportation, food, and housing during the assessment trip. During the assessment trip, members of the chapter met with other Peace Corp volunteers stationed in the area to keep a very strong connection with the community of Los Sanchez.

None of the residences have any basic infrastructure such as electric light, potable water, or even latrines. Most residences only have one room that serves the entire need of the household (living room, sleeping quarters and kitchen). Due to the lack of latrines, basic sanitation is performed outdoors beyond the limits of the Village. Cooking is performed indoors with wood-burning makeshift clay stoves. The stoves are not equipped with chimneys and the walls of their homes are coated with soot. As a result, smoke inhalation is another health issue of concern.

Garbage is usually separated with organic matter (usually food waste) composted to be used as fertilizer. Other garbage is burned by each household at a designated location.

Currently, the Village obtains its water supply from a small stream that flows in a narrow valley below the village. The water thus obtained is used for their basic needs including drinking water. Water used for drinking is often strained with a cloth and stored in covered earthen (clay) jars. Washing and bathing is performed in the Creek. The task of fetching water for the household is the duty of the women and children. This implies 5 to 6 trips to the river, and in some instances, even more. Depending on the location of the residence, each trip can be one quarter to half a mile, over steep rocky terrain.

Most significantly, there is not one single point from where the entire village obtains its drinking water supply. Therefore, it may not be uncommon for one family to obtain their drinking water downstream of where another may be washing or bathing.

PROPOSED WATER SUPPLY
The proposed water supply for the EWB-UT project is a small spring located approximately ¾ miles southwest and 320 feet above the Village. Measurements conducted during the assessment trip estimated the volume to be 34.1 gpm, of which 29.9 gpm were obtain from the main spring, and 4.2 gallons from a small adjacent source. A previous measurement conducted by a Peace Corps volunteer approximately a few days earlier estimated the flow at 15.7 gpm. However, he admitted that he was not able to capture the entire flow emanating from the main spring. Also, he did not measure the adjacent spring.

Also to be taken into consideration is that there was precipitation a few days before the measurement was conducted during the assessment trip. This may also account in part for the higher flow observed. Nonetheless, considering that the measurements were made in summer (dry season) and as a conservative approach, the minimum flow at the spring will be assumed as 20.0 gpm.